12 illustrated steps

VELUX deck-mounted skylight

Follow the 12 illustrated steps in this VELUX deck-mounted skylight assembly.

  1. Step 1

    Opening cut and framed

    A roof deck covered in GAF DeckArmor has a rectangular opening framed with doubled lumber around its edges.
    We open the roof and frame the opening with doubled headers, then trim back the underlayment to make room for the skylight's waterproof wrap.
    Under the deck: doubled header and side framing (trimmer)
    Underlayment cut back 3 in around the opening
    Rough opening width
    30 1/16 in
    Rough opening height
    45 3/4 in
    Underlayment cutback, sides and bottom
    3 in
    Underlayment cutback, top
    5 1/2 in
  2. Step 2

    Skylight set and nailed to the deck

    A skylight with a metal frame and sky blue glass now sits in the framed opening, nailed down to the roof deck.
    We center the skylight on the opening and nail it through its steel flange, then take off its side and bottom covers for wrapping.
    Steel flange nailed to the deck
    24 nails, one in every hole
    Flange nail length
    1 1/4 in
    Flange nails, M06
    24
  3. Step 3

    Adhesive underlayment: bottom

    A strip of black adhesive underlayment now covers the roof deck along the bottom edge of the skylight.
    We seal the bottom of the skylight first with a self-sticking waterproof strip that runs onto the roof and up the frame.
    Strip turns up the frame, 6 in on the roof
    Corner cut and wrapped around
    Strip width
    9 in
    On the roof
    6 in
    Past each corner
    6 in
    Corner cut
    1/2 in
  4. Step 4

    Adhesive underlayment: sides

    Black adhesive underlayment now also runs up both sides of the skylight, over the roof deck.
    We run strips up both sides next. Each one overlaps the bottom strip so water always runs over a joint, never into it.
    Side strip laps over the bottom strip
    Side strip turns up the frame
    On the roof
    6 in
  5. Step 5

    Adhesive underlayment: top

    Black adhesive underlayment now wraps the bottom, both sides and the top of the skylight, leaving only the frame and glass open.
    We add the top strip last, over the side strips, and slip its upper edge under the roof underlayment so water above flows over it.
    Top strip laps over the side strip
    Top edge tucks under the roof underlayment
  6. Step 6

    Shingles up to the skylight

    Shingles now run up the roof to the bottom edge of the skylight, with the black underlayment visible around its sides and top.
    We lay shingles from below up to the bottom of the skylight, covering the lower edge of the waterproof strip.
    Shingles run up to the bottom of the frame
    Shingles cut to fit around the corner
    Shingle exposure
    5 5/8 in
    Nail line from shingle bottom
    6 7/8 in
  7. Step 7

    Sill flashing

    A flat metal sill flashing now covers the bottom edge of the skylight, lying on top of the shingles.
    We set a metal apron on the shingles below the skylight and tuck it behind its rubber seal, sending water onto the roof.
    Flashing slides up behind the rubber gasket
    5 in apron with a folded edge, over the shingles
    Sill flashing apron
    5 in
  8. Step 8

    Step flashing, one piece per course

    Metal step flashing pieces now run up both sides of the skylight, one piece for each shingle course.
    We give each row of shingles its own metal piece along the skylight sides. Each piece overlaps the one below, carrying water down the roof.
    Each piece laps over the one below
    First piece laps over the sill flashing
    Step flashing length
    13 in
    Minimum overlap
    3 1/2 in
    Overlap at 5 5/8 in exposure
    7 3/8 in
    Maximum gap, shingle to upstand
    1/4 in
  9. Step 9

    Covers back on

    The metal covers on the top and sides of the skylight are now in place, and the black underlayment around its edges is mostly hidden.
    We put the skylight's side and bottom covers back on, overlapping the top edge of the flashing so rain runs over it.
    Cover laps over the top of the flashing
    Bottom cover over the sill flashing
  10. Step 10

    Top flashing (saddle)

    A metal saddle flashing now sits on the roof above the skylight, with its upper edge tucked under the underlayment.
    We hook a metal head flashing over the top of the skylight and wrap it around both corners, steering water from above around the skylight.
    Top flashing (saddle) wraps the corner, a tab fixes it to the frame
    Gutter behind the skylight, flange up the roof
    Saddle flange
    9 1/4 in
  11. Step 11

    Leak barrier over the top flashing

    A piece of leak barrier now covers the top of the saddle flashing, its upper edge under the roof underlayment above.
    We stick a piece of leak barrier over the top flashing and slide it under the roof underlayment above, so water flows over every seam.
    Leak barrier sticks down over the saddle flange
    Top edge slides under the underlayment above
  12. Step 12

    Shingles finished

    Shingles now cover the roof up to the skylight on every side, with only the frame, glass and the metal at its bottom edge showing.
    We finish the shingles around the skylight, stopping them 4 in above it so water drains away, and cover the flashing corners with cut shingles.
    Shingles stop 4 in above the skylight
    Cut shingle, nailed under the row above
    Minimum shingle clearance above the skylight
    4 in