7 illustrated steps

Roof valley

Follow the 7 illustrated steps in this roof valley assembly.

  1. Step 1

    Leak barrier in the valley

    Two plywood roof planes meet in an inside corner above a sided wall, with a teal leak barrier sheet running up the valley between them.
    We put a waterproof leak barrier into the valley first, where two roofs meet and their water runs together.
    18 in each side of the valley
    Cut along both eaves, over the eave barrier
    Drip edge (F5.5) mitered at the inside corner
    StormGuard width
    36 in
    Each side of the valley
    18 in
    Minimum sheet overlap
    6 in
  2. Step 2

    Underlayment laps onto the valley barrier

    White underlayment now covers both roof planes and laps up onto the teal leak barrier sheet along the valley.
    We cover the rest of each roof with synthetic underlayment, overlapping the valley barrier so water always runs over a lap, not into it.
    DeckArmor laps 6 in onto the barrier
    DeckArmor edge on top of the teal leak barrier
    At the eave
    Lap onto the valley barrier
    6 in
    Lap over the eave barrier
    3 in
    StormGuard left open in the valley
    24 in
  3. Step 3

    Metal valley (W valley)

    A metal W valley now runs up the center of the valley, over the teal leak barrier sheet.
    We lay a metal valley with a raised center rib over the barrier. It carries the water down the valley and off the roof edge.
    8 in flat each side, 1 in rib
    Low end cut along both drip edge lines
    Nails at the outer edge only
    Valley metal width
    18 in
    Valley metal length
    10 ft
    Flat each side
    8 in
    Center rib
    1 in
  4. Step 4

    Leak barrier strips over the metal edges

    Teal leak barrier strips now run along both edges of the metal valley, with the center rib left open.
    We seal leak barrier strips over both edges of the metal and its nails, keeping every nail hole under a waterproof layer.
    Strip covers the nails and 5 in of metal
    3 in of open metal each side of the rib
    At the eave: metal runs to the drip edge line
    Strip width
    18 in
    Metal covered
    5 in
    Open metal each side of the rib
    3 in
  5. Step 5

    Starter strip at both eaves

    A starter strip now runs along the bottom edges of both roof planes, next to the valley metal.
    We run a starter strip along both eaves, set slightly past the metal drip edge so rainwater drips cleanly off the roof edge.
    Starter stops 3 in from the rib
    End view: starter 1/2 in past the drip edge
    Both eaves
    Overhang past the drip edge
    1/2 in
    Stop back from the rib
    3 in
  6. Step 6

    Shingles cut back from the rib

    Shingles now cover both roof planes and stop short of the center rib of the metal valley.
    We trim the shingles in a straight line on each side, leaving an open metal channel for water to run down the valley.
    3 in of open metal each side of the rib
    Upper corner of each cut shingle clipped 2 in
    Water leaves over the drip edge
    Open metal each side of the rib
    3 in
    Corner clip
    2 in
    Nail setback from the cut line
    6 in
  7. Step 7

    Ridge caps cover the top of the valley

    Ridge cap shingles now cover the top of the valley, with the metal rib showing between the two shingled planes.
    We finish both ridges with ridge cap shingles that cover the top end of the valley metal, closing the last opening at the peak.
    From above: the valley metal runs under the ridge caps
    Open valley below the ridge
    Both ridge cap runs meet in one miter